Back
Key Takeaway
20% cost reduction in overall infrastructure
Achieved 30% resource savings through cloud-native environment establishment via containerizing major services and EKS migration, accelerating transformation into a smart company.
HD Hyundai Oilbank
Client :HD Hyundai Oilbank
Service Area :Migration & Modernization
1. Overview (Project Background)
HD Hyundai Oilbank aimed to 「promote transformation into a smart company through digital transformation」by establishing new business models and innovating corporate value. To achieve this, the company pursued strengthening data-driven enterprise-wide communication and establishing decision-making systems, with cloud migrationand modernizationof major services as core tasks.
2. Challenge (Problem Definition)
Before cloud migration, HD Hyundai Oilbank faced the following key challenges:
Operational and Management Difficulties: Multiple services on a single server made operations and management difficult.
Oracle License Issues: Oracle license problems (Oracle EE) arose from using an integrated database.
Lack of Operational Standards: There was a need to establish cloud standards for source code management and build/deployment processes.
3. Solution (Resolution Approach)
Megazone Cloud performed cloud migration based on the All in Modernization strategy:
EKS Migration and Containerizing
Through EKS migration, explicit management efficiency for each service operation was secured. Additionally, containerizing was applied to improve portability and scalability while maximizing operational management and resource efficiency.
Database Separation and Optimization
The integrated database was separated and migrated to Oracle SE RDS by business classification to optimize Oracle license costs. Additionally, SQL tuning for speed issues and ETL stage optimization improved data processing efficiency.
CI/CD Automation
Cloud standardization for CI/CD was established for server and container environments. A Jenkins·ArgoCD-based CI/CD pipeline was built to automate the deployment process and maximize operational efficiency.
4. Result (Achievements)
Through successful cloud migrationand modernization, the following business results were achieved.
Maximized Operational Management Efficiency
Portability and scalability were improved through containerizing, and operational management was streamlined.
Governance was applied through control tower establishment, and security/operational regulations were complied with.
Cost and Resource Optimization
Approximately 30% cost savings compared to existing EC2 were achieved through integrated EKS configuration.
By separating the integrated database and migrating to Oracle SE, license costs were optimized and operational efficiency was increased.
By converting existing Windows-based Java solutions to Linux (W2L), OS license and maintenance costs were reduced.
Operational Standardization and Improved Deployment Efficiency
Active adoption of managed services (RDS, ALB, etc.) and establishment of integrated monitoring systems increased operational productivity and strengthened incident response capabilities.
CI/CD pipeline and standardized deployment processes were established to maximize deployment efficiency.






